EBC Core Strategy Review
INS10 Inspectors Letter to Council Following their response (EBC13) to Inspectors Post Hearings LetterDownload
Erewash Borough Council have been involved in hearings relating to their Core Strategy Review. For your information, after the hearings, the Council received (INS09), a Post Hearing letter from the Planning Inspectorate. The Borough Council replied to the Inspector in their letter EBC13.
The attached letter, INS10 is the Inspector’s response to EBC13. At the request of the Inspector, also attached is document EBC15, a timetable of works going forward to be carried out by the Council. For more information, please contact Erewash Borough Council on 0115 9072244.